In this commit, we update the `Budget()` call to factor in the
`extraBudget` value. Otherwise, when we go to intialize the fee
function, we won't factor in the extra budget, and will determine that
we can't broadcast/bump.
In this commit, we expand the `NotifyBroadcast` to include an outpoint
index. This is useful as it indicates the index of a given required tx
out input.
In this commit, we start to use the AuxSweeper (if present) to obtain a
new extra change addr we should add to the sweeping transaction. With
this, we'll take the set of inputs and our change addr, and then maybe
gain a new change addr to add to the sweep transaction.
The extra change addr will be treated as an extra required tx out,
shared across all the relevant inputs. This'll also be used in
NeedWalletInput to make sure that we add an extra input if needed to be
able to pay for the change addr.
In this commit, we add a new AuxSweeper interface. This'll take a set of
inputs, and a change addr for the sweep transaction, then optionally
return a new sweep output to be added to the sweep transaction.
We also add a new NotifyBroadcast method. This'll be used to notify
that we're _about_ to broadcast a sweeping transaction. The set of
inputs is passed in, which allows the caller to prepare for the ultimate
broadcast of the sweeping transaction.
We also add ExtraTxOut to BumpRequest pass fees to NotifyBroadcast. This
allows the callee to know the total fee of the sweeping transaction.
This commit removes the call toe `ListLeasedOutputs` in `LeaseOutput` -
the returned info from `ListLeasedOutputs` can easily be accessed via
`FetchInputInfo` and this info is only used at one callsite.
`ListLeasedOutputs` then becomes unnecessary here, plus it's very slow
and needs to be refactored in `btcwallet` instead.
This commit does two things. It starts up the server in a way that
it can be interrupted and shutdown gracefully.
Moreover it makes sure that subsystems clean themselves up when
they fail to start. This makes sure that depending subsytems can
shutdown gracefully as well and the shutdown process is not stuck.
This commit changes how we transform from a deadline option to a
concrete deadline value - previously this is done when we decide to
cluster inputs, and we now move it to a step earlier - once an input is
received via `SweeperInput`, we will immediately transform its optional
deadline into a real value. For inputs that come with a deadline option,
since the Some will be used, it makes no difference. For inputs with
None as their deadlines, we need this change to make sure the default
deadlines are assigned accurately.
This commit adds a new check for neutrino backend - when the inputs in
the sweeping tx are spent by a third party, we will send back a
`TxFailed` event to free the rest of the inputs for re-grouping.
This commit moves the offering of second-level outputs one block
earlier. The sweeper will check the required locktime and wait until it
matures. This is needed so the second-level outputs can be aggregated
properly.
Previously we don't allow confTarget to be 0, which ended up the final
position being never reached. We fix it here by allowing confTarget to
be 0 in case the deadline has already been passed for a given input.
This commit removes the method `CreateSweepTx` and makes sure when
sweeping the htlc output via the direct-preimage spend, it's offered via
the `SweepInput` interface.
This commit adds a new group config `BudgetConfig` to allow users
specifying their own preference when sweeping outputs. And a new config
option `NoDeadlineConfTarget` is added in case the user wants to use a
different "lazy" conf target.
This commit changes the method `ClusterInputs` to also take a default
deadline height. Previously, when calculating the default deadline
height for a non-time sensitive input, we would first cluster it with
other non-time sensitive inputs, then give it a deadline before we are
about to `sweep`. This is now moved to the step where we decide to
cluster inputs, allowing time-sensitive and non-sensitive inputs to be
grouped together, if they happen to share the same deadline heights.